StevenZins's blog

"Las Cruces Convention Center Ready"

From Las Cruces Community Connection

LEDybug PCB Revision 0.4.0 Works!

The PCB got back from Fabrication and Assembly yesterday. The alignment of the LEDs looked very good. Today I checked the power supply voltages, which were good, and loaded the flash. It ran immediately!

This revision corrects a slight flicker problem that is visible in the Pixel Test, a self test, but is not visible in normal scrolling. This board is also about 0.2" shorter than 0.3.0. This allows the case to be a little shorter, and that, in turn, allows the case to be more easily made on our Taig mill.

Marketing Program Progress

I've done a lot of work on  the Marketing Program lately, including page Prices, Commissions, Discounts. Also Company Principles. -sz

The LEDybug Intranet is ready for use.

This is my first status report.

Syndicate content